Skip to content
-
Subscribe to our newsletter & never miss our best posts. Subscribe Now!
Itfy.in

At Itfy, we are dedicated to revolutionizing the way you receive news. Our mission is to provide timely, accurate, and personalized news updates using cutting-edge AI technology. Stay informed, stay ahead with us.

Itfy.in

At Itfy, we are dedicated to revolutionizing the way you receive news. Our mission is to provide timely, accurate, and personalized news updates using cutting-edge AI technology. Stay informed, stay ahead with us.

  • Home
  • Sample Page
  • Home
  • Sample Page
Close

Search

  • https://www.facebook.com/
  • https://twitter.com/
  • https://t.me/
  • https://www.instagram.com/
  • https://youtube.com/
Subscribe
Home/Latest News/Exciting Milestone: NHPC’s Lower Subansiri Project Set to Energize the Future with 3×250 MW Units by May 2025!
Latest News

Exciting Milestone: NHPC’s Lower Subansiri Project Set to Energize the Future with 3×250 MW Units by May 2025!

By adminitfy
December 27, 2024 1 Min Read

Guwahati: NHPC, the state-owned hydro power corporation, announced the anticipated completion dates for its Subansiri Lower hydroelectric project at Gerukamukh, Arunachal Pradesh. Three units, each with a capacity of 250 MW, are scheduled to be operational by May 2025, while the remaining five units, also 250 MW each, are expected to be completed by May 2026.

The company also reported significant financial setbacks due to natural disasters affecting its operations. The Teesta-V power station in Sikkim was severely impacted by an October 2023 flash flood, resulting in damages estimated at Rs 1,075.97 crore. This financial hit has been reported to the insurer, and restoration projects for civil and hydro-mechanical works are underway, with contracts for packages 1 through 5 already awarded.

Additionally, a landslide on August 20, 2024, caused material damage amounting to Rs 327.67 crore. The full extent of this damage is still being assessed as debris clearance progresses in the transformer radiator tank (TRT) and gas-insulated switchgear (GIS) areas. The company stated that tendering for restoration contracts focusing on electrical and hydro-mechanical components is in its advanced stages.

These setbacks underscore the challenges faced by NHPC in maintaining and advancing its hydroelectric ventures in the Northeast and Sikkim, highlighting the pressing need for resilience in infrastructure against natural calamities.

Original Source: https://nenow.in/north-east-news/arunachal-pradesh/arunachal-3-x-250-mw-units-of-lower-subansiri-project-to-be-completed-by-may-2025.html
Category : Arunachal,Northeast News,Sikkim,Top News
Tags:
Publish Date: 2024-12-26 23:19:00

Author

adminitfy

Follow Me
Other Articles
Previous

Beloved Architect of India’s Economic Revolution, Manmohan Singh Passes Away at 92

Next

Farewell to a Visionary: Dr. Manmohan Singh, Iconic Economist and Former PM, Leaves a Lasting Legacy

No Comment! Be the first one.

Leave a Reply Cancel reply

You must be logged in to post a comment.

Search...

Recent Posts

  • Silchar Man Held Over Alleged Bajrang Dal Role in Assault, Extortion
    Silchar Man Held Over Alleged Bajrang Dal Role in Assault, Extortion
    by adminitfy
    June 25, 2026
  • Hello world!
    by adminitfy
    July 3, 2024
  • Empowering Northeast India: CII’s CSR Connect Event Ignites Social Development
    by adminitfy
    July 3, 2024
  • Urgent Crisis: Northeast on High Alert as Death Toll Tragically Rises in Assam
    by adminitfy
    July 3, 2024

Welcome to the ultimate source for fresh perspectives! Explore curated content to enlighten, entertain and engage global readers.

  • Facebook
  • X
  • Instagram
  • LinkedIn

Latest Posts

  • കേരളത്തിലെ sixth ക്ലാസിൽോഗുവിൽ ബിഹാറിന്റെ കുടിയേറ്റക്കാരിയുടെ മഗ്രി пись്കവ്ജഭത് – മലയാളത്തിൽ!
    In 2022, Dharaksha Parveen, a 19-year-old daughter of a Bihar… Read more: കേരളത്തിലെ sixth ക്ലാസിൽോഗുവിൽ ബിഹാറിന്റെ കുടിയേറ്റക്കാരിയുടെ മഗ്രി пись്കവ്ജഭത് – മലയാളത്തിൽ!
  • శక్తి ప్రతిధ్వని: అల్లు అర్జున్ వ్యవహారంపై రేవంత్‌ రెడ్డికి సంచలన ఆదేశాలు!
    Telangana Chief Minister Revanth Reddy has issued strict directives to… Read more: శక్తి ప్రతిధ్వని: అల్లు అర్జున్ వ్యవహారంపై రేవంత్‌ రెడ్డికి సంచలన ఆదేశాలు!
  • భీకరమైన రివ్యూ: అల్లు అర్జున్‌ ‘పుష్ప2’ యాక్షన్ థ్రిల్లర్‌ ఎలా ఉంది?
    Pushpa 2: The Rule Review Title: "Pushpa 2: The Rule"… Read more: భీకరమైన రివ్యూ: అల్లు అర్జున్‌ ‘పుష్ప2’ యాక్షన్ థ్రిల్లర్‌ ఎలా ఉంది?

Contact

Email

info@itfy.in

Location

INDIA

Copyright 2026 — Itfy.in. All rights reserved.