NH10 Connectivity at 20th Mile Likely to Resume Today — Traffic Update
Road connectivity on NH10 at the 20th Mile landslide stretch between Singtam and Rangpo is expected to resume on August 8, 2026, nearly a month after the road was blocked by a landslide on July 7, 2026. Officials said partial vehicular movement would begin by Saturday afternoon, offering immediate relief to commuters and transporters who have faced prolonged disruption.
Roads and Bridges Minister N.B. Dahal inspected the landslide site on Friday and reviewed restoration work. He told reporters that clearing and road-opening operations were progressing well and expressed confidence that vehicles would be able to pass by the afternoon of August 8, 2026.
Since the July 7 disruption, commuters have been using alternate routes via Samardung in Namchi district and the Rangpo–Duga road in Pakyong district. Many passengers reportedly had to walk across the affected stretch to board transit vehicles on either side, adding time and hardship to daily travel.
The state government is also pursuing a permanent solution for the vulnerable stretch. A 50-metre tunnel had been proposed earlier, but the scale of this year’s (2026) landslide prompted a review. Authorities said a revised Detailed Project Report proposing a longer tunnel will be submitted to the Government of India for approval.
The Rangpo–Singtam widening project is scheduled to start in December 2026, and the proposed tunnel is expected to be included under that scheme. Dahal said he hoped the central government would extend full support; he also cited Prime Minister Narendra Modi’s assurance of an alternative Greenfield Highway to strengthen Sikkim’s connectivity.
Officials warned that the prolonged closure of NH10 has inflicted significant losses on Sikkim, disrupting the movement of goods and construction materials, hampering ongoing construction projects and affecting the state’s GST revenue. Dahal expressed the hope that the 20th Mile landslide would stabilise if the area avoids heavy rainfall in the coming days.
The reopening of NH10 is expected to provide much-needed relief to commuters, transporters, businesses and local residents who have borne the brunt of the extended disruption.
Original Source: https://www.sikkimexpress.com/news-details/nh10-connectivity-at-20th-mile-likely-to-resume-from-today
Category:
Tags:
Publish Date: