Mining Hearing Erupts in Chaos: Regulators Face Uproar
Shielded by pre-emptive arrests, dug-up access roads and a heavy police presence that witnesses say used tear gas, the public hearing for Shree Cement Limited’s limestone mining project at Lum Syrman concluded on July 31 amid violence and accusations of systematic exclusion. The Meghalaya State Pollution Control Board (MSPCB) and district authorities called the proceedings “successful,” but local pressure groups and affected residents labelled the event a “private hearing” of Chief Minister Conrad K. Sangma and Deputy Chief Minister Prestone Tynsong.
Organisers moved the hearing up to 8:00 AM from the scheduled 10:00 AM, a shift that protest leaders said compounded access problems. Members of the JSU, KSU, HNYF and JNC reported being blocked by unidentified people and project supporters from as early as 6:00 AM. Protesters alleged deliberate obstruction of access routes, including sections of road dug up and trenches created to stop vehicles reaching the venue.
Residents and landowners from Shnongrim, a primary area that would be affected by the proposed mining, said they were denied entry despite producing official communications identifying them as affected parties. Opposition groups say many legitimate stakeholders were prevented from participating in the consultation.
Violence escalated late on Thursday when an ambulance sent by the JSU to assist those affected by tear gas was reportedly pelted with stones near Cement Bazar. The union said the vehicle was damaged and the driver and medical attendants injured, and confirmed it would file an FIR over the incident.
Tensions were heightened by the pre-emptive detention on Thursday night of several Jaintia National Council (JNC) leaders, including President Sambormi Lyngdoh and General Secretary Wanshwa Suting. The Jaintia Students Movement (JSM) has issued a 24-hour ultimatum to the district administration for their unconditional release and warned of intensified agitation.
Inside the venue, the session was chaired by Additional District Magistrate Alertson Nongbri and MSPCB environmental engineer YFH Laloo and remained tightly controlled under heavy security. Supporters — including the Dolloi of Elaka Nongkhlieh and local village representatives — argued the project would create jobs and spur economic development, provided legal and environmental safeguards are met. ADM Nongbri said the hearing “went well.”
Opposition groups dismissed the consultation’s legitimacy. “How can a public hearing be held without allowing the opposition to attend?” a JSU official asked, alleging police passivity while protesters were attacked. Leaders who could not reach the venue later gathered at Umpleng to reiterate their opposition and demand action against those responsible for blockades and attacks.
The events have exposed deep divisions over the Lum Syrman mining proposal and set the stage for a prolonged confrontation between the state government and local community organisations.
Original Source: https://theshillongtimes.com/2026/08/01/mining-hearing-erupts-in-chaos/
Category: MEGHALAYA
Tags:
Publish Date: 2026-08-01 02:43:00