Assam Alert: Unused Geo-Bags in Palasbari Threaten Riverbanks
Around 2.5 lakh geo bags procured for riverbank protection have reportedly lay unused for nearly two to three years at the Water Resources Department’s inspection bungalow premises at Chulikata near Simina Chowk in Kamrup district, residents say, even as erosion along the Brahmaputra continues to threaten homes, farmland and infrastructure in the Palasbari constituency. Geo bags are sand-filled geotextile sacks commonly used to stabilise riverbanks and check erosion.
Local residents allege the large stockpile-kept in the open with weeds and vegetation growing around it-risks deterioration, and warned that materials worth crores of rupees could become unusable if left exposed. The community said the unused supplies could have been deployed earlier to protect vulnerable stretches in Simina, Guimara and Gumi, where erosion has been recurring.
Villagers criticised what they described as poor planning and inadequate management by authorities, and said the prolonged storage reflected a failure to respond promptly to an ongoing threat. They have urged Chief Minister Himanta Biswa Sarma and the Water Resources Department to ensure accountability, deploy the materials before they degrade, and order an inquiry into the delay.
The erosion-control works along the Palasbari–Gumi stretch were earlier carried out under an Asian Development Bank–assisted project executed by Brahmaputra Infrastructure Limited, residents noted, but claimed the geo bags remained unattended despite continuing riverbank loss in the region.
A Water Resources Department official responded that the geo bags were procured for the ADB-assisted project under a contract awarded to Brahmaputra Infrastructure Limited and that about 90% of the project work in the Palasbari area has already been completed. The department said the stock at the Chulikata inspection bungalow is in good condition, fully usable, and will be deployed in the next phase of anti-erosion works in Chhaygaon and Boko.
While officials maintain the materials are earmarked for upcoming projects, residents and observers say the presence of such a large quantity of erosion-control material during an active erosion season is likely to draw continued public scrutiny.
Original Source: https://www.indiatodayne.in/assam/story/assam-lakhs-of-geo-bags-lie-unused-in-palasbari-as-erosion-ravages-riverbanks-1431787-2026-07-30?utm_source=rssfeed
Category:
Tags:
Publish Date: 2026-07-30 21:22:00