Revolutionary Plan Unveiled: Transform Hebbal Junction with Umashankar’s Comprehensive Intermodal Connectivity Solution!
BBMP Administrator and Additional Chief Secretary of the Urban Development Department, S.R. Umashankar, conducted an inspection of several development projects in Bengaluru, emphasizing the urgency of easing traffic congestion at Hebbal junction. As part of the broader initiative, he directed officials to devise a comprehensive intermodal connectivity plan incorporating various infrastructure projects, including overpasses, underpasses, metro works, and suburban rail, alongside a proposed tunnel road. During his visit, Mr. Umashankar also instructed the traffic police to coordinate with the Bangalore Development Authority to expedite the work at Hebbal and addressed issues regarding the poor road conditions, calling for milling and resurfacing. At Kempapura junction, amid metro station construction, the BMRCL plans to open three lanes on either side for smoother traffic flow, with a push from Mr. Umashankar to accelerate work during off-peak hours. He also tackled flooding challenges at Nagawara and Silk Board junctions, mandating enhancements in the storm-water drain network and long-term flood mitigation measures. Additionally, he reviewed progress on the Ejipura flyover and Jayanagar BDA complex redevelopment, urging a swift completion and comprehensive planning for new commercial complexes.
Original Story https://www.thehindu.com/news/cities/bangalore/design-comprehensive-intermodal-connectivity-plan-to-decongest-hebbal-junction-says-umashankar/article68841305.ece
Category : Bengaluru
Tags: